Track for the Gotthard Base Tunnel
The Gotthard Base Tunnel opened in 2016.
The aim of the new two-track underground line is to increase the capacity of the existing Lower Inn Valley railway. The approximately 41-kilometre-long new stretch with a designed speed of 250 kilometres per hour comprises a slab track and extensive, finely graded mass-spring systems.
Planning of slab track and mass-spring systems in all phases of design/approval planning, invitations to tender for equipment, detailed design to construction support and coordination.
Brenner Eisenbahn GmbH (BEG; now: ÖBB-Infrastruktur AG)