Ettisbühl power plant, Malters

Project overview

The Ettisbühl power plant was constructed together with a driftwood retention as part of flood protection measures on the river Kleine Emme. The plant consists of a weir system and a power station (vertically installed Kaplan turbine). A fish ladder positioned laterally to the underwater channel facilitates fish migration.

Our services

In an engineering syndicate: detailed design, site management, risk management, cost control, construction accounting.

Expertise involved

Hydraulic engineering, Hydropower

Client

Steiner Energie AG