Minster revitalisation project

Project overview

In the section from the confluence of the Waag river up to the Sihlsee lake, the Minster river runs predominantly in a hard-installed trapezoidal channel with continuous bed paving. The Minster river is being ecologically upgraded with measures to widen the cross-section and provide it with a more natural design, as well as with the construction of two large widenings.

Our services

Concept study, audit of the current condition, study of variants at the pre-study stage, pre-project to determine the best option, hydrodynamic 1D and 2D calculations.

Expertise involved

Hydraulic engineering

Client

Etzelwerk AG and SBB Infrastructure, Energy