Bad Zurzach eastern bypass: road construction

Project overview

With a view to easing congestion in the centre of the municipality of Bad Zurzach, a new one-kilometre-long, two-lane cantonal bypass road is built. The tunnel, which is approximately 530 metres long, is built using the cut-and-cover method. Part of the route runs parallel to a creeping landslide in a section with a tie-back anchored retaining wall. At the connection to the existing cantonal road, the junctions will be redesigned and the existing SBB bridge replaced.

Client

Office of Construction, Transport and Environment, canton of Aargau

Our services

Overall management as well as management of project planning, invitations to tender and implementation. 

Similar projects