Maintenance planning for the supply of water for firefighting, national road section St. Gallen West – St. Gallen East
Project overview
The ten kilometre section St. Gallen West – St. Gallen East of the national road N01 was opened in 1987. No maintenance work has been performed in 25 years. Basler & Hofmann was awarded the contract for drawing up a concept and action plan for repairs and maintenance. This also included checking and developing measures for the supply of water for firefighting.
Client
ASTRA Winterthur branch
Our services
Coordination with the water supplies of St. Gallen, checking of the water supply network based on a simulation model in WaterCAD with water drawn from hydrants and with new installation of connecting pipes, development of maintenance measures in relation to the supply of water for firefighting.