Noise protection on N03/56 Wollishofen – Wädenswil

Project overview

The project involves an overhaul of the noise protection on the 15-kilometre section of the motorway between Wollishofen and Wädenswil. Along the entire project perimeter, two new noise barriers have been planned and two extended. The existing part has been replaced. A total of approximately 1.6 kilometres of noise protection was constructed using lava concrete.

Client

Federal Roads Office (FEDRO), Winterthur branch

Our services

Project planning and execution in relation to the track, engineering structures, special civil engineering, drainage, environment and acoustics.

Similar projects