Repair of A1 Zurich East–Effretikon section

Project overview

With 110,000 vehicles a day, the section of national road between the Zurich East interchange and Effretikon is one of the most heavily used stretches of motorway in Switzerland. In order to optimise traffic, slip roads are to be extended, markings and signals replaced and speed harmonisation and a hazard warning system implemented. Over the medium term, the hard shoulders in both directions are to be converted into traffic lanes.

Client

Federal Roads Office (FEDRO)

Our services

Project engineers for repairing of a 4- to 10-lane section of a motorway track (i.e: surface repair, renewal of duct bank and new signal bridges) including the surrounding environment, the engineering structures (widening of a ramp bridge and relocation of existing noise protection walls) and retaining structures.

Similar projects