Zurich Airport: finger dock B apron
Project overview
Finger dock B was redesigned in the context of the Schengen Agreement. The apron had to be modified, taxiways moved and a double taxiway introduced. The construction site was developed landside with a 250-metre-long temporary bridge, with the taxiways being built in stages during normal flight operations.
Expertise involved
Airport constructionClient
Flughafen Zürich AG
Our services
Allocation of civil engineering work, feasibility study,site development and logistics concept, planning approval concept, project planning and implementation, coordination of planning and implementation of overall project.