Zurich West development complex and demolition of Coop distribution centre
Project overview
The approximately 40,000-square-metre Coop distribution centre had to be demolished for the Zurich West development complex, with the building components containing asbestos and contaminants being removed beforehand. In parallel to the excavation work, the oil contamination in the ground was cleaned up by means of a drained excavation as well as using overlapping large scale boring.
Expertise involved
Contaminated sitesClient
Coop Immobilien AG, Losinger Marazzi AG
Our services
Building checks for asbestos and building contaminants, contaminated-sites analyses, demolition and disposal concept, project planning of oil-contamination clean-up, invitation to tender and site supervision.