02.02.2021 | News Basler & Hofmann provides financing for a new centre in the area of digital planning and construction at ETH Zurich
04.03.2020 | News Basler & Hofmann is now represented in the global Building Room Steering Committee of buildingSMART International
07.01.2020 | News New Internet presence for engineering consortium Ingenieurgemeinschaft Pardeller from South Tyrol
13.11.2019 | Films Expansion of the office building A in Esslingen: The "Future Tree" – a pilot project for parametric planning
30.09.2019 | Films Expansion of the office building A in Esslingen: optimising room acoustics with parametric planning
01.07.2019 | Films Basel refuse incineration plant: special shoring struts for the installation of a heat pump
13.06.2019 | Films Expansion of the office building A in Esslingen: digitalisation in building services engineering
13.11.2018 | News Arc-Award in BIM innovation: nomination for Basler & Hofmann’s office building in Esslingen
Oktober 2018 | Films Extension of office building A in Esslingen: from the digital model to the construction site
12.10.2018 | News Interview with Rolf Steiner, municipality of Küsnacht - «The construction site is becoming more transparent.»
26.05.2018 | News Basler & Hofmann supports award-winning Swiss pavilion “Svizzera 240: House Tour” at the Biennale in Venice
13.04.2018 , Zurich | News All change on the Supervisory Board of Basler & Hofmann AG, with a new chairman and two new members
13.03.2018 | News Basler & Hofmann wins third prize in the Bridges of Saint-Triphon project competition
31.01.2017 | Report A unique supporting structure for a new building at the Swiss Federal Institute of Technology (ETH) Zurich
19.01.2017 , Amsterdam | Event Review and presentation on the Symposium: Challenges in evidence-based biosafety
15.09.2016 | News Basler & Hofmann is awarded the contract for a second large lot at the Gare de Lausanne
22.06.2016 | News Roland Keller new head of the Building Services strategic initiative at Basler & Hofmann
24.05.2016 | Specialist article Tunnel 3/2016 - Ulriken Tunnel: The first TBM Drive for a Railway Tunnel in Norway
11.08.2015 | Report Just before the blast: On site with the vibration monitoring experts from Basler & Hofmann
01.04.2015 | Specialist article Plaxis Bulletin 2015: Pavement service life prediction and inverse analysis with Plaxis 3D
01.11.2014 | Specialist article 14-11 ICE Proceedings - Pre-stressing of soil and structure due to jet grouting
25.08.2014 | News Generation shift in the Executive Board: Martin Bosshard hands the baton to Stefan Moser
12.03.2014 | Specialist article Sixth International Symposium on Tunnel Safety and Security 3/2014 - Smoke Tests